| Item | Aluminum tile trim |
| Material | 6063 \ 6061 \ 6060 |
| Temper | T5 / T6 |
| Thickness | 0.8 - 5.0mm |
| Length | 6m (customizable) |
| Surface treatment | Mill finish \ Power coating \ Anodizing \ Electrophoresis \ Fluorocarbon coating \ Wood grain, etc. |
| Color | According to customer requirements (customizable) |
| Service support | Drilling \ Milling \ Cutting \ Welding \ Bending \ Assembling \ CNC |
| Packing details | Inside: packed with protective film to protect each piece |
| Outside: wrap to be bundles by shrink plastic bag | |
| Delivery time | Die developing and sample testing: 7 - 10 days |
| Mass production completed: 15 - 30 days | |
| MOQ | 500kg |
Quickly provide accurate samples for testing.
Provide pre-processing services, such as cutting, drilling, milling, etc.
Provide RAL or Pantone color cards precise color matching.
Provide product images, videos, and technical parameter manuals.
Provide guidance on profile application, such as assembly process and hardware accessory adaptation suggestions.
Cooperative warehouses can be set up in your region.
Q1: What materials are used for your aluminum transition strips?
A1: Our transition strips are manufactured from high-quality 6063, 6061, or 6060 aluminum alloys, with standard tempers of T5 or T6 to ensure maximum structural strength and longevity.
Q2: Can the length and surface finish of the profiles be customized?
A2: Yes, the standard length is 6m, but it is fully customizable. We offer a wide range of surface treatments including mill finish, powder coating, anodizing, electrophoresis, fluorocarbon coating, and wood grain finishes.
Q3: Do you support post-processing operations like cutting and drilling?
A3: Yes, we provide full service support for post-processing, including precise drilling, milling, cutting, welding, bending, assembling, and custom CNC machining according to your layout requirements.
Q4: What is the typical lead time for custom tooling and mass production?
A4: Die development and initial sample testing typically take 7 to 10 days. Once approved, mass production is completed within 15 to 30 days depending on order complexity and volume.
Q5: What is the Minimum Order Quantity (MOQ) for orders?
A5: Our standard Minimum Order Quantity (MOQ) is 500kg per specification, which ensures cost-effective production runs and pricing.
Q6: How are the aluminum profiles packed for transit?
A6: To prevent damage, each individual piece is wrapped in a protective film internally, while the exterior is securely bundled using shrink plastic wrap for safe transportation.